Session

Session 2008
August 24 - 29, 2008
Paris (France)

Preferential Subjects for Paris 2008

SC C2: System Operation and Control

PS1: New applications in system operation and control for detection
and mitigation of system conditions
• Requirements and experience from new substations control system
and design; impact on the grid under severe conditions.
• Application of synchronised phasor measurements.
• Improved modeling and improvement in large computational system
for operational studies.
• Reliability and dependability of special protection system: performance
indicators.
• Requirements in design and implementation of restoration tools
and procedures.

PS2: Evolution of operation reliability standards in the context
of open markets and reduced security margins
• Criteria and standards level metrics and performance indicators.
• Impact on operation of increased physical and security requirements.
• Incident review process in use and its contribution to preventing
disturbances.
• Operators training requirements and certification.

PS3: Impact on system operation and control of the integration
of large wind generation
• Forecasting techniques and methods.
• Security of supply, demand response and reserve margins.
• Balancing techniques and methods.
• Frequency control.

Information about the Session








www.cigre.org