Working groups area

Here is the list of the SC C2 Advisory and Working Groups which are presently active.

By clicking on the group title, you will learn more about each of them.

C2 WGs List of Work Groups
C2.11 Substation Control systems in light of recent developments in Substation Control (work completed)
C2.12 Applications of Synchronised Phasor Measurement in Power Systems
C2.13 Voltage/Var support in System Operations
C2.14 Requirement on design and implementation of Restoration Tools and Procedures
C2.15 Common Information Model and its prospective use in power system operations
C2.21 Lessons learnt from recent Emergencies and Blackout Incidents
C2.22 Application of resilience engineering to safety management principles in Control Centers, ensuring and enhancing power system reliability
C2.31 Joint and coordinated development of operators in control centre from different companies and nationalities (work completed)
C2.32 Emergency organisation in control centres crisis management in system operation (work completed)
C2.33 Control Centre Operator Requirements, Selection, Training and Certification
C2.34 Capabilities and Requirements of a Control Centre in the 21st century - Functional and Human resources view
JWG C2/C5 Development and changes in the Business of System Operators
AG SCC2 Management team SCC2
SCC2 AG C2.3 Minutes of Meeting - August 26, 2008







www.cigre.org