| C2 WGs | List of Work Groups |
| C2.11 | Substation Control systems in light of recent developments in Substation Control (work completed) |
| C2.12 | Applications of Synchronised Phasor Measurement in Power Systems |
| C2.13 | Voltage/Var support in System Operations |
| C2.14 | Requirement on design and implementation of Restoration Tools and Procedures |
| C2.15 | Common Information Model and its prospective use in power system operations |
| C2.21 | Lessons learnt from recent Emergencies and Blackout Incidents |
| C2.22 | Application of resilience engineering to safety management principles in Control Centers, ensuring and enhancing power system reliability |
| C2.31 | Joint and coordinated development of operators in control centre from different companies and nationalities (work completed) |
| C2.32 | Emergency organisation in control centres crisis management in system operation (work completed) |
| C2.33 | Control Centre Operator Requirements, Selection, Training and Certification |
| C2.34 | Capabilities and Requirements of a Control Centre in the 21st century - Functional and Human resources view |
| JWG C2/C5 | Development and changes in the Business of System Operators |
| AG SCC2 | Management team SCC2 |
| SCC2 AG C2.3 | Minutes of Meeting - August 26, 2008 |