Structure

This page presents the structure of SC C2

Membership of Working Bodies can be found in the 'Membership' page.

Working Groups' Terms of Reference can be found in the 'Official SC Documents' page.


Chairman

Joachim VANZETTA

Secretary

Christoph SCHNEIDERS


ADVISORY GROUPS
Ref Title Convener Dates
AG SCC2 Management team SCC2 Chairman and the Secretary 2007-
SCC2 AG C2.3 Minutes of Meeting - August 26, 2008 August 26, 2008
 
 
Working Groups - Task Forces
Ref Title Convener Dates
C2 WGs List of Work Groups
C2.11 Substation Control systems in light of recent developments in Substation Control (work completed) Michael POWER 2007-2008
C2.12 Applications of Synchronised Phasor Measurement in Power Systems Louis Wenkel 2006-2008
C2.13 Voltage/Var support in System Operations Thales Papazoglou 2007-2009
C2.14 Requirement on design and implementation of Restoration Tools and Procedures To Be Defined 2007-
C2.15 Common Information Model and its prospective use in power system operations Tanja Kostic 2007-2009
C2.21 Lessons learnt from recent Emergencies and Blackout Incidents Ben Li
C2.22 Application of resilience engineering to safety management principles in Control Centers, ensuring and enhancing power system reliability TBD
C2.31 Joint and coordinated development of operators in control centre from different companies and nationalities (work completed) Udo SPANEL 2006-2008
C2.32 Emergency organisation in control centres crisis management in system operation (work completed) Christian FONTAINE 2006-2008
C2.33 Control Centre Operator Requirements, Selection, Training and Certification Ninel Cukalevski (Serbia) February 7, 2009
C2.34 Capabilities and Requirements of a Control Centre in the 21st century - Functional and Human resources view Udo Spanel March 27, 2009
JWG C2/C5 Development and changes in the Business of System Operators Ole Gjerde 2000-2010







www.cigre.org