|
Structure
This page presents the structure of SC C2
Membership of Working Bodies can be found in the 'Membership' page. Working Groups' Terms of Reference can be found in the 'Official SC Documents' page. |
|
Chairman |
Secretary |
| ADVISORY GROUPS |
| Ref | Title | Convener | Dates |
| AG SCC2 | Management team SCC2 | Chairman and the Secretary | 2007- |
| Working Groups - Task Forces |
| Ref | Title | Convener | Dates |
| C2.11 | Substation Control systems in light of recent developments in Substation Control | Michael POWER | 2007-2008 | C2.12 | Applications of Synchronised Phasor Measurement in Power Systems | Louis Wenkel | 2006-2008 | C2.13 | Voltage/Var support in System Operations | Rui Pestana | 2007-2009 | C2.14 | Requirement on design and implementation of Restoration Tools and Procedures | To Be Defined | 2007- | C2.15 | Common Information Model and its prospective use in power system operations | Tanja Kostic | 2007-2009 | C2.21 | Lessons learnt from recent Emergencies and Blackout Incidents | TBD | C2.22 | Resilience engineering in increasing power system security, minimising the impacts and preventing blackout in the event from normal to extreme disturbances occurring | TBD | C2.32 | Emergency organisation in control centres crisis management in system operation | Christian FONTAINE | 2006-2008 | C2.31 | Joint and coordinated development of operators in control centre from different companies and nationalities | Udo SPANEL | 2006-2008 | JWG C2/C5 | Development and changes in the Business of System Operators | Ole Gjerde | 2000-2010 |